EDF La Vanelle dam

Decorative image - Photo credit: ©Eiffage Métal

Strengthening water infrastructure for a safer, more sustainable future

To replace the aging floodgates on its La Vanelle dam, EDF was looking for an industrial partner capable of guaranteeing the safety and extending the service life of the structure.

The aim of the project was to optimize hydraulic management and enhance resilience to climatic hazards, while modernizing the infrastructure to improve its overall performance.

The EDF La Vanelle dam project reflects our expertise in managing large-scale steel structures. Thanks to our proven technical expertise, we were able to meet the challenges posed by the hydraulic and environmental constraints specific to this type of infrastructure.

EDF La Vanelle dam construction site  - Photo credit: ©Eiffage Métal

Eiffage Métal's scope of activity

Eiffage Métal took charge of all operations relating to the replacement of the floodgates:

  • Project management
  • Design and technical studies
  • Manufacture of the gates, measuring 20 m x 11 m x 11 m, at our Fos-sur-Mer plant, and application of anti-corrosion protection
  • Installation on customer site and commissioning 
  • Design, manufacture, dismantling and replacement of the complete drive system (motors, gearboxes, extensions, indicators, clutches, brakes, etc.)
  • Complete drafting of operating procedures and manufacture of equipment required for the work.
     

Key figures

  • 3
    floodgates replaced
  • 120
    tonnes of metal per valve
  • More than 100
    employees mobilized

Why Eiffage Métal?

EDF La Vanelle dam construction site  - Photo credit: ©Eiffage Métal

Eiffage Métal was selected for its technical expertise and ability to manage large-scale projects in the hydraulic infrastructure sector. Our skills in terms of safety, security and reliability of installations fully met the requirements of the project and the expectations of EDF.

  • Recognized expertise in the industrial and hydraulic sectors: construction of “movable bridges” and preservation of hydraulic heritage.
  • Turnkey solution: control of all phases, from design to installation.
  • Mastery of technical constraints: adaptation to specific site conditions and existing infrastructures.
  • Experience in heavy load transfer: ability to handle complex, large-scale metal structures.
  • Tailor-made technical proposals: flexibility to adapt to project developments.